Model |
Pressure(ton) |
Bale size(mm) |
Hopper size(mm)L*W |
Weight(ton) |
Machine size(mm) |
WEB-30A |
30 |
500*500 |
800*420 |
4.5 |
4500*3300*1400 |
WEB-40A |
40 |
720*720 |
1500*640 |
7 |
6770*3050*3580 |
WEB-60A |
60 |
1100*750 |
1500*1020 |
9 |
6880*3850*3550 |
WEB-80A |
80 |
1100*750 |
1500*1020 |
12 |
6880*3850*3550 |
WEB-100A |
100 |
1100*1100 |
1800*1020 |
18 |
8560*3950*4550 |
WEB-120A |
120 |
1100*1250 |
2100*1020 |
21 |
9250*4150*4850 |
WEB-150A |
150 |
1100*1250 |
2400*1020 |
26 |
10050*4100*4910 |
WEB series horizontal balers are mainly used for packing paper (cardboard, paper box, etc.), plastics (PET bottles, plastic films, etc.), straw and other loose materials.
To reduce the volume of materials, with high density, being convenient for delivery and storage.
It is a powerful helper for comprehensive utilization and development of biomass energy.
Cardboard | PET Bottles | Paper | Textile |
Biomass Straw | Pastic Film | etc





1. PLC program, touch screen control, simple operation, self-contained feeding detection, automatic compression, realize unmanned operation.
2. Automatic packing device, fast speed, simple structure, stable movement, low failure rate and easy cleaning and maintenance.
3. Machine size and bale size can be adjusted according to customer requirements.
4. Automatic fault diagnosis, automatic display, improve detection efficiency.








Q:Are you a factory or a trade company?
A:We are a manufacturer with our own factory in Wuhu City, Anhui Province, China. Welcome to take a visit!
Q:How to choose a shredder machine?
A:Our technical consulting services can help, recommend the most suitable machine and program according to your needs, capacity, site and other actual situation.
Q:How about the service?
A:We provide after-sales service, including on-site installation, commissioning equipment, guidance and training of operators etc. Make regular return visits to solve your equipment problems and optimize your equipment maintenance methods.
Q:How long is your delivery time?
A:Generally, it will be about 35-40 days after deposit, which also will affected by the actual situation of the project.
Q:Which trade terms is available?
A:FOB, CFR,CIF, EXW and other terms based on your needs.